PV C&I, Bozhurishte, 339 kWp
- Location: Bozhurishte
- Construction: AEROCOMPACT
- Role of the GES: Full EPC
Description
In partnership with Electro Trade Bulgaria, we successfully delivered a rooftop photovoltaic system with an installed capacity of 339 kWp. The project is designed to cover over 50% of the site’s electricity consumption, contributing to significant energy cost savings and a reduced carbon footprint for the client.
The installation supports the client’s long-term strategy for sustainable energy management and the efficient use of renewable energy sources.



