C&I PV with BESS, Graf Ignatievo, 100 kW/ 233 kWh
- Location: Graf Ignatievo
- Role of the GES: Full EPC
- Capacity: 233 kWh
- Power: 100 kW
- PPP: yes
- BESS: yes
Description
The project integrates a modern Dunext C&I All-in-One battery system with an installed power of 100 kW and a capacity of 233 kWh, complementing the photovoltaic plant with an installed capacity of 88 kWp. This solution significantly enhances the flexibility and reliability of the site’s energy system by enabling efficient management of the generated electricity.
With the implementation of the BESS, the client achieves optimized self-consumption, the ability to store excess energy, and its utilization during periods of peak demand or grid instability. As a result, peak loads are reduced, and the overall energy efficiency of the site is improved.
GES Energy delivered the project as a full EPC contractor—from design and supply to installation and commissioning—ensuring high quality and reliability of all implemented solutions.