C&I PV with BESS, Sevlievo, 200 kW / 224 kWh BESS
- Location: Sevlievo
- Role of the GES: Full EPC
- Capacity: 224 kWh
- Power: 230 kWp
- PPP: Yes
- BESS: Yes
Description
The project in Sevlievo, Bulgaria combines a rooftop photovoltaic installation with a modern energy storage system, placing a strong focus on efficient energy management.
The integrated battery system has a total capacity of 224 kWh and plays a key role in increasing the site’s energy independence. It enables storage of surplus energy generated by the 230 kWp photovoltaic plant and its use during periods of higher demand or grid fluctuations.
By implementing an energy storage system, the client optimizes self-consumption, reduces peak loads, and improves the stability of the energy infrastructure. The solution contributes to better control over electricity costs and creates opportunities for future integration of additional energy technologies.
GES Energy delivered the project as a FULL EPC solution — from design and supply to installation and commissioning — with all major components provided by our long-term partner Green Energy Supplier.