PV C&I Luben Karavelovo, 230 kWp
- Location: Luben Karavelovo
- Construction: Xiamen Fasten Solar Technology Co.,Ltd
- Role of the GES: FULL EPC
- Power: 230 kWp
- Modules: Jinko Solar 590 Wp N-type
- Inverters: Huawei SUN2000
Description
The installation has a total capacity of 230 kWp.
For the mounting, we used a high-quality modular structure for LT sheet metal by the Chinese manufacturer Fasten Solar, ensuring stability and durability. The system includes Jinko Solar N-type TOPCon panels with a unit capacity of 590 Wp – monofacial modules from the latest series of this leading manufacturer. The system is equipped with 4 Huawei SUN2000 inverters, each with a unit capacity of 50 kWp, guaranteeing efficiency and reliability.
The entire system is designed for self-consumption and will cover up to 30% of the enterprise’s annual electricity needs.
We thank our partners for their trust and the opportunity to work on this significant project, which represents yet another step towards a sustainable and economically efficient future!